ODESSA JOINT OPERATIONS FACILITY

Odessa Joint Operations Facility

This joint complex is located on a 105 acres at 6165 West Murphy Road on the western edge of Odessa Texas. The facility is home to a large fleet of Baker Hughes trucks and truck mounted equipment and includes fifteen drive through Vehicle Maintenance bays for large equipment, and various high bay workshops and parts warehousing. The site has 1,535,829 sf. of heavy duty paving for truck parking along with a four bay truck wash (manual and automatic), diesel fueling facility, truck scale, Bulk Cement Plant, Bulk Acid distribution plant, covered tote and drum storage building, coil tubing spooling structure, and contained storage yard with lined secondary containment pond. The facility also includes a 44,126 sf., two story, tilt wall and glass building housing offices and locker rooms.

PROJECT INFORMATION

Location: Odessa, TXValue: $44,183,000Size: 122,158 Square FeetConstruction Method: Tilt Wall, Pre Engineered Metal BuildingsDelivery Type: Design-BuildProject Type: Oilfield Service CenterProject Attributes: Office, Specialty Purpose

We are the reliable partner to help you complete the work